Sites Under Development

We acknowledge that this land is in Mi’kma’ki, the ancestral and unceded territory of the Mi’kmaq of Nova Scotia.

The following wind projects are being developed for future requests for proposals, or procurement processes. Project development is at a preliminary stage. We have performed desktop studies and are currently testing the wind. Each project would have as many as 16 turbines and would produce approximately 80 megawatts, enough electricity for 23,000 homes in Nova Scotia.

www.melvinlakewind.ca

www.rhodenawind.ca

www.sandypointwind.ca

We are working on projects totalling 1,500 megawatts in Nova Scotia, New Brunswick and Newfoundland and Labrador, with anticipated commissioning dates between 2024-2028.

 

Sites in Operation

Nova Scotia

These sites were developed under the COMFIT Program in Nova Scotia and commissioned in 2014. The wind turbines are Vestas V-100 2MW at 100-metre hub height.

  • Whynotts Wind Farm — 4 megawatt (MW) project developed in partnership with the Assembly of Mi’kmaq Chiefs close to Bridgewater, Nova Scotia
  • Pockwock Wind Farm — 10 MW project developed with Chebucto Pockwock CEDIF just outside Halifax
  • Millbrook Wind Farm — 6 MW project developed with Millbrook First Nation at Truro
  • Truro Heights Wind Farm — 4 MW project developed with Eskasoni First Nation at Truro

New Brunswick

Cap Pele — single turbine project (Enercon E-92) developed under NB Power Embedded Generation program, commissioned in 2018